Inverter Protocol & Telemetry Integration Hub.
Solar EPCs and system integrators eliminate on-site troubleshooting delays with Summit's pre-loaded multi-protocol BMS firmware. Native dual-isolated CAN 2.0A/B (500 kbps), RS485 Modbus RTU, and substation-level IEC 61850 / Modbus TCP ensure seamless plug-and-play handshakes.
Verified Hybrid & Off-Grid Inverter Brands
Real-world certified telemetry: State-of-Charge (SoC), individual cell voltages, temperature gradients, and dynamic Charge Current Limits (CCL/DCL).
| Inverter Manufacturer | Supported Inverter Series | Protocol & Interface | Screen Parameter | Verification |
|---|---|---|---|---|
| Deye CAN / BMS Port (RJ45) | SUN-5K/8K/10K/12K-SG04LP3, SUN-3/5/6K-SG01HP3 Series | CAN 2.0B (500 kbps) & RS485 Modbus | Lithium Mode: 00 (CAN) | ✓ Verified Plug & Play |
| Growatt BMS Port (RJ45) | SPF 3000-5000TL HVM, SPH 4000-10000TL3, WIT/WIS Series | CAN / RS485 (Baud: 9600 / 115200) | Program 05: LI | Program 36: 51 | ✓ Verified Plug & Play |
| Victron Energy VE.Can / BMS-Can Port (Type A) | MultiPlus-II 48V, Quattro 48V via Cerbo GX / Venus OS | VE.Can (Baud rate: 500 kbps) | Profile: CAN-bus BMS (500 kbit/s), DVCC: ON | ✓ Certified Compatible |
| Solis CAN Port (RJ45) | RHI-3P(5-10)K-HVES-5G, S5-EH1P, S6 Series | CAN 2.0A (500 kbps) / RS485 | Battery Select: User-Def / CAN (Password: 0010) | ✓ Verified Plug & Play |
| GoodWe BMS Port (RJ45) | ET Series (5K~10K), ESA, ES G2, Lynx Home | CAN 2.0B / RS485 (500 kbps / 9600) | SolarGo App: Lithium / CAN Profile | ✓ Verified Plug & Play |
| SMA RJ45 Com-Sync | Sunny Island 4.4M / 6.0H / 8.0H Series | CAN Bus Standard (500 kbps) | Batt Type: Li-Ion / CAN Open (Terminator On) | ✓ Verified Plug & Play |
| Sofar Solar BMS Port (RJ45) | HYD 3-20KTL-3PH, ME3000SP, ESI Series | CAN / RS485 (500 kbps / 9600) | Battery Model: Default CAN | ✓ Verified Plug & Play |
| Sunsynk CAN Port (RJ45) | Sunsynk 3.6kW, 5kW, 8kW, 12kW, 16kW Hybrid | CAN 2.0B (500 kbps) | Batt Setting: Lithium / Protocol 00 | ✓ Verified Plug & Play |
| Luxpower CAN / COM Port (RJ45) | SNA 5000, LXP Hybrid 3.6K~12K Series | CAN 2.0B / RS485 (500 kbps / 9600) | Lithium Brand: Protocol 00 | ✓ Verified Plug & Play |
RJ45 Hardware Pinout & Cabling Standard
Summit battery cabinets feature dual RJ45 8P8C ports (Port 1: CAN / RS485 for inverter uplink, Port 2: RS485-Link for inter-cabinet daisy chaining). Standard T568B CAT5e/CAT6 STP shielded cables are mandatory.
Standard RJ45 8P8C Pin Assignment (T-568B Standard)
Dual Bus Isolated| Pin # | Wire Color | CAN Bus | RS485 Bus | Engineering Description |
|---|---|---|---|---|
| Pin 1 | White / Orange | — | RS485_A (A+) | Differential Data A+ for Modbus RTU communication |
| Pin 2 | Orange | CAN_GND (Shield) | RS485_B (B-) | Differential Data B- for Modbus RTU / CAN Ground |
| Pin 3 | White / Green | — | GND_ISO | Galvanically isolated signal ground reference |
| Pin 4 | Blue | CAN_H (High) | — | Differential High Signal for CAN 2.0A/B (2.5V – 3.5V) |
| Pin 5 | White / Blue | CAN_L (Low) | — | Differential Low Signal for CAN 2.0A/B (1.5V – 2.5V) |
| Pin 6 | Green | CAN_GND | GND_ISO | Isolated logic ground return path |
| Pin 7 | White / Brown | — | RS485_A (Daisy) | Parallel cabinet inter-BMS communication link A |
| Pin 8 | Brown | — | RS485_B (Daisy) | Parallel cabinet inter-BMS communication link B |
Dual-Port Galvanic Isolation
2.5 kV RMS isolation prevents earth potential shifts between battery ground and inverter DC bus, eliminating logic latch-up during high-surge load cycling.
Built-in 120Ω End Termination
Internal hardware DIP switch toggles 120Ω termination across CAN_H and CAN_L lines, preventing waveform reflections across extended trunk runs up to 30 meters.
EMI Shielding Separation
Always route STP patch cables with ≥10 cm physical separation from DC positive/negative conductors to prevent high-frequency PWM inverter noise coupling.
Substation-Level & SCADA Protocols (IEC 61850 / Modbus TCP)
For commercial cabinets (ELS series) and containerized BESS (SLS series 2.5–5 MWh), Summit systems incorporate carrier-grade communication gateways supporting international power grid standards.
Substation Automation
Dual MMS client/server redundancy, GOOSE rapid inter-trip messaging (<4 ms), SV sampled values for protection relays.
Industrial SCADA Gateway
Standard Port 502, dual 100BASE-TX Ethernet, 2,000+ registers for PCS, HVAC chiller, aerosol suppression and cell voltages.
Telecontrol & Dispatch
Secure TCP/IP telecontrol protocol for AGC automatic generation control and real-time frequency stabilization commands.
Real-time Fieldbus
Sub-millisecond deterministic communication between multi-channel PCS converters and battery string management units (BSMU).
1~16 Unit Parallel BMS DIP Switch Binary Addressing Guide
When scaling Summit battery cabinets in parallel (from 16 kWh up to 256 kWh), each cabinet's BMS must be configured with a unique hardware binary DIP address. Only Pack 1 (Master) communicates directly with the hybrid inverter; all other packs (Slaves) communicate with the Master via internal RS485 Link.
DIP Switch set to Address 01 (1 0 0 0). Connect the CAN/RS485 cable directly from Pack 1's BMS port to the hybrid inverter's BMS port.
DIP Switches set to Addresses 02 through 16 sequentially. Daisy-chain using standard RJ45 patch cables: Pack 1 RS485-OUT → Pack 2 RS485-IN → Pack 3 RS485-IN...
Pack 1 aggregates total capacity (e.g. 256 kWh), sum of charge/discharge currents, and highest/lowest cell voltages, presenting one unified battery bank to the inverter.
| Cabinet Unit | Binary Code | DIP 1 | DIP 2 | DIP 3 | DIP 4 | Assigned Address | System Role & Connection |
|---|---|---|---|---|---|---|---|
| Pack 1 (Master) | 1 0 0 0 | ON | OFF | OFF | OFF | 0x01 | Master (BMS to Inverter CAN/RS485) |
| Pack 2 (Slave 1) | 0 1 0 0 | OFF | ON | OFF | OFF | 0x02 | Slave (Link to Pack 1 via RS485) |
| Pack 3 (Slave 2) | 1 1 0 0 | ON | ON | OFF | OFF | 0x03 | Slave (Link to Pack 2 via RS485) |
| Pack 4 (Slave 3) | 0 0 1 0 | OFF | OFF | ON | OFF | 0x04 | Slave (Link to Pack 3 via RS485) |
| Pack 5 (Slave 4) | 1 0 1 0 | ON | OFF | ON | OFF | 0x05 | Slave (Link to Pack 4 via RS485) |
| Pack 6 (Slave 5) | 0 1 1 0 | OFF | ON | ON | OFF | 0x06 | Slave (Link to Pack 5 via RS485) |
| Pack 7 (Slave 6) | 1 1 1 0 | ON | ON | ON | OFF | 0x07 | Slave (Link to Pack 6 via RS485) |
| Pack 8 (Slave 7) | 0 0 0 1 | OFF | OFF | OFF | ON | 0x08 | Slave (Link to Pack 7 via RS485) |
| Pack 9 (Slave 8) | 1 0 0 1 | ON | OFF | OFF | ON | 0x09 | Slave (Link to Pack 8 via RS485) |
| Pack 10 (Slave 9) | 0 1 0 1 | OFF | ON | OFF | ON | 0x10 | Slave (Link to Pack 9 via RS485) |
| Pack 11 (Slave 10) | 1 1 0 1 | ON | ON | OFF | ON | 0x11 | Slave (Link to Pack 10 via RS485) |
| Pack 12 (Slave 11) | 0 0 1 1 | OFF | OFF | ON | ON | 0x12 | Slave (Link to Pack 11 via RS485) |
| Pack 13 (Slave 12) | 1 0 1 1 | ON | OFF | ON | ON | 0x13 | Slave (Link to Pack 12 via RS485) |
| Pack 14 (Slave 13) | 0 1 1 1 | OFF | ON | ON | ON | 0x14 | Slave (Link to Pack 13 via RS485) |
| Pack 15 (Slave 14) | 1 1 1 1 | ON | ON | ON | ON | 0x15 | Slave (Link to Pack 14 via RS485) |
| Pack 16 (Slave 15) | 0 0 0 0 | OFF | OFF | OFF | OFF | 0x16 | Slave (Max 256kWh Expanded Array) |
Inverter Touchscreen & App Setup Walkthrough
Select your inverter brand below to view exact screen menu paths, protocol selection values, and parameter validation benchmarks.
Deye / Sunsynk Hybrid Inverter Commissioning
Compatible with SUN-5K/8K/10K/12K-SG04LP3 low-voltage & high-voltage series
Connect standard RJ45 cable from Summit Cabinet CAN port to the Deye inverter's CAN Port.
On Deye touchscreen, press Gear Icon → Battery Setting → Batt Mode. Check checkbox for Lithium.
In the Lithium Mode input box, enter 00 (Pylontech CAN compatible). Press Enter / Save.
Open Li-BMS Page: Verify Pack Voltage (~51.2V), real-time SoC %, charge current limit (150A per cabinet), and 0 fault alarms.
Need a Custom CAN Protocol or Regional Inverter Firmware?
Working with a specialized inverter brand not listed above? Summit's in-house electrical and BMS engineering team customizes CAN ID frames, baud rates, and Modbus registers with verified firmware delivery within 48 hours.